This job story focuses on a unique, customized approach to quickly and efficiently reducing the water content of waste ash so that the cost of transporting the ash can be reduced.
A power generation station in the Middle Atlantic region needed clinging material removed from silo walls. AIRMATIC got the job done with acoustic cleaning.
A power generating station struggled to unload 3 million pounds of woodchips from railcars five days per week. AIRMATIC recommended the vibrator that made the difference.
Critical isolation valves at a New England power plant could not be counted on to close completely due to buildup on the valves. AIRMATIC brought a dependable solution.
Send me new case studies as they become available.
Need technical assistance? Talk with an AIRMATIC Expert now.